MIL-PRF-29250C
4.1.2 Quality conformance inspection. The quality conformance inspection shall include the
examination of 4.3, the test of 4.4.5, and the inspections of 4.5 and 4.6. This inspection shall be
performed on the samples selected in accordance with 4.2.
TABLE II. Completed first ILJS inspection.
I 1/
A 1/
D 1/
T 1/
Paragraph number/title
3.5.1
Attaching points
X
X
3.5.2
Corner jack assemblies
X
X
X 4.4.4.1
3.5.5
Tires
X
X
3.5.6
Brakes
X
X
3.5.7
Towing assembly
X
X
X 4.4.4.2
3.6
Dimensions and clearance
X
3.7
Weight
X 4.4.4.3
3.9.1
Lifting with ILJS
X
X
3.9.3,
X
X 4.4.4.4
3.9.4,
Controllability and slope
3.9.5
3.9.7
Level loading
X
X 4.4.4.5
3.9.8
25K-loader loading
X
X 4.4.4.6
3.9.9
Wind load
X
4.4.4.7
3.9.10 Parking brake performance
X
X
3.9.11 Mobility requirements
X 4.6.4
3.10
Towing vehicle
X
3.11
Maintenance characteristics
X
X
3.12
Transportability
X
3.13
Environmental conditions
X
X 4.4.4.8
3.14
System safety requirements
X
X
1/
1/
D 1/
T 1/
Paragraph number/title
I
A
3.15
Human factors
X
X
3.15.1 Lifting limits
X
X
3.15.2.1 Attachment of ILJS
X
3.16
Reliability
X
X 4.4.4.9
3.17
Maintainability
X
3.18,
Painting
X
3.18.1
3.19
Lubrication
X
X
3.20,
Nameplates and markings
X
3.20.1
3.21
Workmanship
X
3.21.1 ILJS fabrication
X
X
through 3.21.6
NOTE 1/
I=Inspection; A=Analysis; D=Demonstration; T=Test.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business