MIL-C-53057(ME)
specification. The inspection will be performed by the Government at
a site selected by the Government. Acceptance of an initial
production crane shall not exclude the remaining cranes from the
quality conformance inspection and acceptance provisions specified in
section 4. In addition to any test specified as part of the initial
production test, the Government reserves the right to conduct any and
all other tests contained in this specification as part of the
initial production test, and failure of any tests shall be cause for
rejection.
4.5 Quality conformance inspection
.
4.5.1 Examination. Each crane shall be examined for the defects
marked "X" in column 3 of table II (see 4.6.1). Presence of one or
more defects shall be cause for rejection.
4.5.2 Tests. Each crane shall be tested as specified in column 4 of
table III (see 4.6.2). Failure of any test shall be cause for
rejection.
4.6 Inspection schedule.
4.6.1 Examination. Cranes shall be examined as specified herein in
accordance with table II. An (X) in the column indicates the
examinations that shall be conducted.
42
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business