MIL-C-53057(ME)
TABLE III.
Test schedule.
(Continued)
Test
Requirement
Test
Paragraph
paragraph
1
2
3
4
5
6
7
X
X
-
-
Nuclear-biological-chemical.
4.6.2.34
3.38
X
X
-
-
Electromagnetic pulse.
4.6.2.34.1
3.38.1
X
X
X
X
Diagnostic connector assembly
4.6.2.35
3.41
capability.
X
X
X
X
DCA-STE/ICE interface.
4.6.2.35.1
3.41
X
X
-
-
Load moment indicator.
4.6.2.36
3.13.7
X
X
-
-
Crane structure.
4.6.2.37
3.1.4, 3.13.5,
3.13.2
X
X
X
X
Boom extension speed,
4.6.2.38
3.9.7, 3.13.8
retraction speed, extension
cylinder cavitation,
simultaneous hoist and boom
extension.
X
X
-
X
Swing speed, swing brake swing
4.6.2.39
3.13, 3.13.1 or
lock and anti-two blocking.
3.13.2
X
X
-
-
Heater.
4.6.2.40
3.27.4
4.6.2.2 Engine. The diesel engine shall be tested or certified in
accordance with 5.2 and 5.3 of MIL STD-1410.
-
4.6.2.3 Dimensions, weight, and operating radii Determine the
.
crane overall height, width, and axle spacing in accordance with SAE
J1234. Obtain front and rear axle weights of the complete crane
fueled and serviced without load with the boom fully retracted.
Determine the maximum reach, and operating radii in accordance with
test method No. 1. Nonconformance to 3.1.2.1, 3.1.2.2, 3.1.2.3,
3.1.2.4, and 3.9.9 shall constitute failure of this test.
4.6.2.4 Lifting speed, towering speed, lift cylinder cavitation
main and auxiliary hook block speed Test the crane in accordance
.
with test method No. 2. Nonconformance to 3.9.5, 3.9.6, and 3.13.8
shall constitute failure of this test.
4.6.2.5 Curb clearance circle. Determine the curb clearance circle
as defined in Field Test Procedure of SAE J695 with the boom fully
retracted. Nonconformance to 3.9.8 shall constitute failure of this
test.
4.6.2.6 Travel speed. Test the crane in accordance with test method
No. 3. Speeds not as specified in 3.9.3 shall constitute failure of