MIL-C-53057(ME)
TABLE III. Test schedule. (Continued)
Test
Requirement
Test
Paragraph
paragraph
1
2
3
4
5
6
7
4.6.2.17.1
3.12.1.4
-
Pump inlet pressure.
X
-
-
4.6.2.17.3
3.12.8
X
Hydraulic system roll-off
X
X
X
cleanliness.
4.6.2.17.4
3.12.7
-
Hydraulic cylinders.
X
X
-
4.6.2.17.5
3.12.2
-
Pump contaminant tolerance.
X
-
-
4.6.2.17.6
3.12.1.1
-
Hydraulic fittings
X
X
-
4.6.2.17.7
3.12.6
-
Hydraulic control valves.
X
-
-
4.6.2.19
3.28
-
Electromagnetic interference.
X
X
-
4.6.2.20
3.31, 3.1.3.1
-
Slinging provisions.
X
X
-
4.6.2.21
3.31, 3.1.3.1
-
Tiedown provisions.
X
X
-
4.6.2.22
-
Noise level measurement.
-
-
-
4.6.22.1
3.6.1.1
-
Operator's station.
X
X
-
4.6.2.22.2
3.6.1.2, 3.25
-
Exterior noise.
X
X
-
4.6.2.23
3.10.2.8, 3.4.4
-
Rain.
X
X
-
4.6.2.24
3.16
-
Wheel guards.
X
X
-
4.6.2.25
3.4.2, 3.4.3,
-
X
X
-
Low temperature (-25° F)
3.10, 3.10.2.1,
3.10.2.6, 3.12
4.6.2.26
3.9, 3.9.4,
-
-
X
X
Wet brakes and fording.
3.10.2.9, 3.23,
Service brake.
3.18.1
4.6.2.27
3.9.12
-
-
X
X
High speed.
4.6.2.28
3.23.12, 3.23.13
-
-
X
X
Controls.
4.6.2.29
3.9.11, 3.10.2.6,
-
-
X
X
Endurance.
3.10, 3.11, 3.12,
3.11.1, 3.11.1.1
4.6.2.29
3.8, 3.10,
-
-
X
X
Reliability.
3.10.2.4,
3.10.2.6, 3.11,
3.11.1.1, 3.12
4.6.2.30
3.7
-
-
X
X
Maintainability.
4.6.2.31
Section 3
-
X
X
X
Run-in.
4.6.2.32
3.11.2
-
-
X
X
Rear axle oscillation.
4.6.2.33
Section 3
X
-
X
-
Post-test.
50
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business