MIL-C-53057(ME)
TABLE II.
Examination schedule.
(Continued)
Requirement
paragraph
Defects
1
2
3
4
5
X
X
X
123a. Main or auxiliary winch missing or
3.13.4
not as specified.
X
X
X
124a. Main or auxiliary wire rope missing
3.13.5
or not as specified.
3.14
X
X
X
125a. Outriggers or outrigger pads
missing or not as specified.
X
X
X
126a. Rear steer indicator missing or not
3.23.4
as specified.
X
X
X
3.24.4.3
127a. Interior lighting not as
specified.
4.6.2 Tests. Tests shall be conducted in accordance with table III.
An "X" in the column indicates the tests that shall be conducted.
4.6.2.1 Test conditions. Unless otherwise specified herein, tests
shall be conducted at the ambient temperature and climatic conditions
existing at the place of test. Only that maintenance established by
the contractor and submitted as maintenance schedule prior to
commencement of the tests shall be performed during the tests. Safety
and human factors considerations (see 3.5 and 3.6) shall be evaluated
throughout testing. Test methods referenced in tests specified herein
are those contained in the appendix. Operation of the crane shall be
with fuels, oils, lubricants, and antifreeze specified herein as
applicable for the temperature conditions existing at place of test.
48
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business